Holderness Flood Alleviation Scheme

Elite Precast supplied Legato® interlocking concrete blocks for the £28 million Holderness Flood Alleviation Scheme, providing rapid, durable flood defence infrastructure for the Environment Agency.

Holderness Flood Alleviation Scheme
Client
Environment Agency
Location
Holderness, Hull
Result
Delivered a significant improvement in flood protection while creating valuable community and ecological assets.

The Holderness Flood Alleviation Scheme (FAS) is a £28 million initiative delivered for the Environment Agency between 2018 and 2024 by JN Bentley as a Design and Build contract, with JBA Consulting as the designer. The project aimed to significantly reduce flood risk for communities along the Holderness Drain, a vital watercourse that serves a 238 km² catchment and is crucial for the drainage of Hull and surrounding areas.

The scheme was developed in response to historic flooding events, notably the 2007 floods that impacted over 55,000 homes and 95 schools in Hull City Centre.

Elite Precast was selected as a key supplier for the project, providing Legato® interlocking concrete blocks for critical flood defence infrastructure. These blocks were chosen for their rapid installation, durability and adaptability to challenging site conditions — qualities that made them ideal for both permanent and emergency flood protection applications.

Project Components

East Hull Pumping Station

A new, online pumping station designed to handle up to 10 m³/s of water, with overdrive capacity to 12 m³/s. Elite Legato® blocks were integrated into the site's flood defence systems, providing robust protection for the station and surrounding infrastructure.

Castlehill Flood Storage Area (Aquagreen)

This area was transformed from a wet, inaccessible agricultural buffer zone into a multi-functional flood storage and community asset. The Legato® blocks contributed to the construction of new embankments and access routes, supporting both flood resilience and improved community access.

Advantages of Legato® interlocking blocks

Rapid Installation

The Legato® blocks enabled quick deployment, reducing construction time and minimising disruption.

Durability and Adaptability

The interlocking design provided strong flood defence, even in areas with limited space or complex access requirements.

Environmental Benefits

The use of precast concrete reduced the need for extensive on-site concrete pours, lowering the project's carbon footprint and supporting the scheme's broader sustainability goals.

Project Outcomes

The Holderness FAS has delivered a significant improvement in flood protection. The Legato® interlocking blocks contributed to both the structural integrity and operational resilience of the scheme, while also supporting the creation of valuable community and ecological assets.

Conclusion

Elite Precast played a vital role in the success of the Holderness Flood Alleviation Scheme, providing innovative, reliable and sustainable solutions that met the project's demanding technical and environmental requirements.